top of page

LEECO STEEL

Location:

Completion Date:

Size:

Brandon, South Dakota

2015

58,320 SF

This new 58,320 sq. ft. warehouse facility, built for a regional steel wholesaler, required SGA to coordinate with the rail yards for a built-in delivery system. The fat rail car is backed into the facility for unloading and allows use of the overhead crane which allows LEECO Steel to be more efficient. This project was designed with expansion in mind; it allows for a future 20,000 square foot addition. The warehouse space is primarily utilized for the distribution of raw steel but includes office space, a laser cutting table, and locker rooms to round out the function of the space.

bottom of page